SPORTS AND WELLNESS COMPLEX IN SILUTE

Client: Silute District Municipality Administration
Project proposals: Year 2015

___The sports and leisure building being designed will join the urban environment of Silute Town as a bright touch in terms of its scope. This phenomenon will not only expand the borders of the quality of life of a harmonious society in the urban environment, but it will also undoubtedly form a new architectural environment. Therefore both natural and cultural aspects are taken into consideration when designing the volume of the building with its scope defined by its function.
___The functional layout of the building is based on the present gym building and the requirement to prepare a project for two phases of construction.
___The first phase of the construction will focus on reconstruction of the present building (the gym) in order to equip:
– on the first floor: a 25-metre long, 4-track pool; a bathhouse complex; 4 different purpose bath facilities; a children’s pool; a Jacuzzi; a recreational water area; a gym for powerlifters; a gym with fitness facilities; aerobics and yoga rooms; a SPA centre with a pool; 7 double rooms; a café.
– on the second floor: a SPA area with massage as well as physical therapy facilities and a salt room; a relaxation room with 2 baths; area for athletes (a running track, two Eastern martial arts rooms, a boxing ring); a conference centre with a separate entrance, a mini kitchen, and a bathroom; a methodical room; a children’s playroom. Mobile partitions could be used for division of the area for athletes into three rooms, whenever necessary. The conference centre with a separate entrance, a mini kitchen, and a bathroom can operate independently from other areas. The planned capacity of the complex in terms servicing customers is up to 150 customers at the same time.
___A multi-purpose gym would be designed during the second phase of construction. The gym would be designed in a manner to enable 3 teams train at the same time, i.e. 3 areas at the size of a basket ball court would be formed by separating them with sports blinds. The same method may also be applied in order to get 2 outdoor tennis courts. Besides these two sports, the gym would be used for other sports as well: futsal, handball, badminton, volleyball, various gymnastics exercises. 1100 seats for the audience have been planned. VIP grandstands, administrative and operator premises would be planned on the second floor.